Plant Construction

Plants - Optimization
Existing ventilation systems must be able to be adapted to changed conditions and increased production output.
SIROCCO offers a comprehensive program for the optimization of existing ventilation and heating systems through the targeted recording of data, the implementation of measurements, the proposed solutions developed from this and their implementation.
​
-
Advice on optimization potential
-
Recording of actual states
-
Development of optimization measures
-
Construction and assembly of necessary extensions
-
Commissioning and adjustment
Plants - Extension
When expanding production processes and lines, it is necessary to provide existing systems with additions, components and new assemblies. SIROCCO offers the complete package required for this, from the development of the interfaces and the planning of the system expansion to the implementation of the conversions.
​
-
Discussion of the necessary steps
-
Definition of the interfaces
-
Development of expansion measures
-
Construction and assembly of necessary extensions
-
Commissioning and adjustment
Plants - Erection Form
An increase in production quantities is often only possible with the installation of additional ventilation systems and heat exchangers.
It requires new technical facilities that can ensure capacity expansion. With its complete solutions, SIROCCO can contribute to meeting future customer requirements in the best possible way.
​
-
Development of the requirement profile
-
Concept creation
-
Elaboration of the necessary technical facilities
-
Construction and assembly of the components
-
Commissioning and adjustment
-
Provision of the documentation
Retrofitting of air conditioning units
The conversion of existing air conditioning systems for factory buildings to highly efficient axial fans saves energy costs and reduces CO2 emissions.
The solution consists of a very efficient combination:
Axial fan Efficiency 92%
Permanent magnet-Motor Efficiency 95%
Frequency converter Efficiency 98%
SIROCCO offers a total solution from the analysis to the finished implementation – short amortization times through energy savings are guaranteed.
-
Analysis of the actual situation, consumption and costs
-
Design of the fan system
-
Calculation of energy savings and payback period
-
Concept creation
-
Implementation of the conversion
-
Commissioning and adjustment
-
Verification of actual savings